Skip to content
A four-storey campus building at Obudu with rooftop water tanks
05Non-Destructive Integrity Testing

British-Canadian University

Client
British-Canadian University
Location
Obudu, Cross River
Year
2022

Felmos Engineering carried out non-destructive testing across the university's campus at Obudu: the administration block, the faculty building, hostels one and two, the library, and staff quarters one and two. A single mobilisation covered the whole campus rather than returning building by building.

On Site

Photographs From The Work

8 photographs taken during the survey.

Need this done on your building?

Tell us what you're building or verifying, and get a certified engineer on it.

Book Your Inspection